Project
Evaluation of the Viper pump flow-enhancer prototype
Year
2010
status
Completed
Researcher
Jonathan Large (Lead)
Other Collaborator(s):
–
Advisory Member(s):
Alberta Forestry, Parks and Tourism,
Abstract
FPInnovations was asked to evaluate a prototype of the Viper Pump Flow Enhancer to determine its usefulness for water delievery applications during wildfire operations.